Product Description
The Crescent Leader Tape Measure has a rugged, vinyl-covered steel case and thick chrome blade designed to outlast the jobsite. Its easy action winding drum and nylon roller guides keeps friction when rewinding the tape to a minimum.
Features
- Chrome Clad(R) blade
- Folding end hook ring
- Large easy action winding drum and friction washers
- Nylon roller guides the tape smoothly in and out of case
- Rugged, vinyl-covered steel case
Specifications
- Auto-Lock: No
- Blade Finish: Chrome Clad(R)
- Blade Length: 50 ft
- Blade Material: Steel
- Blade Style: B7
- Blade Width: 0.375 in
- Case Color: Black
- Case Material: Steel
- Country of Origin: MX
- Coupon Headline: Leader(R)
- Family Name: Leader(R)
- Foreign Trade Code: 9017800000
- Locking: No
- Long Description: 3/8" x 50' Leader(R) Chrome Clad(R) Tape Measure
- Measurement Type: SAE
- Overall Height: 1.0 in
- Overall Length: 4.0 in
- Overall Width: 4.0 in
- Packaging: Boxed
- Replacement Blade/Jaws: None
- Set: No
- Style of Case or Reel: Vinyl Covered Steel Case
- Table Description: 3/8" x 50' Leader(R) Chrome Clad(R) Tape Measure
- Warranty: Full Lifetime
- Weight: 0.930 lbs